Arrival of Playtime II

October 9, 2003

Click on thumbnail to enlarge picture

10 - First Siting 11 - Coming off Freeway Ramp 12 - Turning onto Street 13 - Made in under signs 14 -  On its way to Marine Services
15 - Our Oversize Load 16 - Waiting 17 - Lead Car Driver 18 - Paul and Driver 19 - Backing into Marine Services
20 - Headed for Sling 21 - Turning toward sling 22 - Paul next to boat 23 - Side view on trailer 24 - Gettin ready for the sling
25 - Applying the straps 26 - It's a boy 27 - Driver removing trailer straps from boat 28 - Starting to lift from the trailer 29 - Off the trailer
30 30 - Being moved in the sling 31 - Headed to a resting place 32 - Back of boat on sling 33 - View of props
34 - Another sling shot 35 - Slipped into space 36 - Closup of straps 37 - Under the swim platform 38 - Paul leaning on swim platform
39 - Placed on Stands 40 - Removing the sling 41 - Without the sling 42 - Joanne beside boat 43 - Wow is that big!
45 - First siting after shrinkwrap 45 - Looking toward master 45 - Looking toward stern from kitchen 46 - Shrinkwrap partially removed